Replace 18″ Vessel Manway with 24″ Vessel Manway

This upgrade required ABEC to replace an existing 18” manway with new 24” manway on top head, re-locate the valve actuator to avoid interference with piping, remove and plug sidewall manway assembly, find new location for CIP assembly, and perform a spray ball coverage test. Read about how ABEC addressed these upgrades.